PREPARATION
SST
Recomended Tools
Equipment
SSM
Cylinder head ASSY (2AZ-FE)
COMPONENTS
OVERHAUL
1. REMOVE VALVE LIFTER
HINT:
Arrange the valve lifters in the correct order.
2. REMOVE INTAKE VALVE
(a) Using SST and wooden blocks, compress and remove
the 8 valve spring retainer locks.
SST 09202-70020 (09202-00010)
(b) Remove the retainer, valve spring and v ...